|
|
|||||||
| Open Tender details : | |||||||
| Enquiry No. | I-4642 | Reference | |||||
| Enquiry Date | Closing Date | EMD(Rs.) | |||||
| Title | |||||||
| Bidder's Pre Qualification | |||||||
| Bidding Instruction | |||||||
| The interested parties should go through the given specifications, and General Terms and Conditions before submitting their offer on-line. HCL reserves the right to cancel the tender or award the contract in part or full at its sole discretion. General Terms and Conditions are enclosed herewith. The Procurement would be done through Enterprise Procurement System, conducted by M/s. Mjunction Services Limited, Kolkata. Date : Tender Closing date : 14.08.2012 at 11.00 A.M. Tender Opening (Part I) : 14.08.2012 at 14.00 P.M. Price Bid Opening : Shall be intimated later. Note1: Vendors may note that after the specified time and date of tender closing, same enquiry cannot be accessed by the vendor. During the specified time when the tender is in open for bid submission, you may modify the bids as per your convenient, where in case of multiple modifications the last submitted offer will be taken into consideration. Note 2 : EMD’s and any other necessary documents should reach AGM (Materials & Contract), Hindustan Copper Limited, Indian Copper Complex, PO:Ghatsila-832303, Dist. East Singhbhum, Jharkhand, on or before the Opening Date of the Tender as specified in the Enquiry, i.e., 20.01.2012. You have to deposit the amount of Rs. 4,000/- (Rupees four thousand only) towards Earnest Money Deposit in the form of Demand Draft/Pay Order/Banker’s Cheque in favour of “Hindustan Copper Limited”, payable at Moubhandar. EMD in the form of Bank Guarantee is acceptable. You should indicate the details of EMD at the special term box provided at the Bid submission page of Enterprise Procurement System. Without EMD bids will not be considered. But, SSI units registered with NSIC for MS Fabrication are exempted from payment of EMD against valid documentary evidence, which should be sent separately to HCL. EMD to the unsuccessful bidders shall be refunded after finalization of order. |
|||||||
| Download Tender Document |
|
||||||
AGM ( M & C)
|
|||||||